CYPC insists on the differentiated development of new energy businesses, and actively explores the coordinated development path of new energy with large-scale hydropower, pumped storage, and integrated smart energy. It vigorously promotes the acquisition of high-quality resources and project construction, achieves high-quality operation of the integrated water, wind and solar energy base in the lower reaches of the Jinsha River, and has put into operation new energy projects. Its controlled installed capacity has exceeded 2,000 MW. These measures have made great contributions to the construction of a new power system in which new energy plays the leading role.
New Energy Business